Year of construction: 2018
water area:
- swimming area: 33 m²
- regeneration area: 10 m²
- total area: 43 m²
water depth: 1,5 m
liner: green
other:
planning and completion:
Garten- und Landschaftsbau Kreye GmbH & Co. KG
DE-27777 Ganderkesee
A very special project. The limited space meant that the basin for the Swimming Pond had to be built prior to the building. To allow swimming despite the small size, a counter-current system was installed, and the sauna in the outbuilding makes the facility usable year-round.