Year of construction: 2020
water area:
- swimming area: 52 m²
- regeneration area: 58 m²
- total area: 110 m²
water depth: 1,9 m
liner: green
other:
Electric chamber Vers. 01.03 Injector nozzle D 20
planning and completion:
Roth Garten und Landschaftsbau
DE-94081 Fürstenzell
We were allowed to create a gigantic Biotop Swimming Pond landscape for a young family in Lower Bavaria. The idea was to turn an old, overgrown pond into an oasis of well-being. The view into the green invites family and friends to splash around.