Year of construction: 2021
water area:
- swimming area: 30 m²
- regeneration area: 30 m²
- total area: 60 m²
water depth: 1,5 m
liner: blue
other:
© Mina Al Samarriy
planning and completion:
John GmbH
DE-96103 Hallstadt
A Swimming Pond in a historic urban setting with a natural garden, which, despite being difficult to access, creates a peaceful, green oasis in the middle of the city.