Year of construction: 2010
water area:
- swimming area: 18 m²
- bio filter area: 8 m²
- total area: 25 m²
water depth: 1,5 m
liner: green
other:
planning and completion:
Biotop P&P International GmbH
AT-3411 Weidling
For years the garden owner had come to Biotop’s open day "Tag des Swimming-Teiches", only to have to resign himself to the fact that a natural pool could not be realized in his garden. It would mean the end of even a small lawn. The Biotop Swimming Pool turned out to be just what he’d been looking for and was implemented immediately on his property, which slopes slightly downward. Difficulties that arose were the very narrow entrance of 1.20 meters and the fact that there was no room to put the building materials. However, this was more than compensated for during the construction phase by the enthusiasm of the whole family, which grew from day to day.