Year of construction: 2014
water area:
- swimming area: 70 m²
- regeneration area: 70 m²
- total area: 140 m²
water depth: 2,0 m
liner: green
other:
Filter system: BIOTOP compact filter
planning and completion:
Bahl GmbH Garten-, Landschafts- und Schwimmteichbau
de-25368 Kiebitzreihe/Elmshorn
A nine-year-old biotope was dismantled and subsequently enlarged to create a 20 meter long swimming lane complete with a counter current jet. All of the technical equipment was supplied by BIOTOP; underwater lighting, as well as a garden shower as an artistic decorative element complete the renovation project. The swimming area is accessible via two stairs.