Year of construction: 2020
water area:
- swimming area: 57 m²
- regeneration area: 60 m²
- total area: 117 m²
water depth: 1,4 m
liner: dark grey
other:
Aquarius Universal Premium Eco 3000,
Pomp Aquamax ECO Premium 20000
EPS automatic water level regulator
planning and completion:
Landscaping Hendrix
BE-3990 Peer
A builder friend from a neighbouring municipality had heard from acquaintances that Landscaping Hendrix had become a Biotop Partner in 2019, introducing a technically superior concept for the construction of Swimming Ponds in the Belgian province of Limburg. He invited us for an interview and was immediately taken by the enthusiasm with which I described our new partnership. The contract was extended and we were asked to do the entire garden design, including the pool house. He granted us complete freedom regarding the form, only for the materials used he had one condition: Everything had to have been living before and exude charm! Sustainable building with recycled material. It was only the second Biotop project we have designed and built, but it fills us with a lot of pride!