Year of construction: 2021
water area:
- swimming area: 21 m²
- regeneration area: 20 m²
- total area: 41 m²
water depth: 1,5 m
other:
green pool cover
planning and completion:
Florijk
NL-5222 BP ’s-Hertogenbosch
This Swimming Pond is a concrete construction with a Combi-Box V75 built in. The very central location in the heart of the city made the site extremely difficult to reach. It sits behind a monumental building against the ancient city wall. The equipment of this pool includes IPE decking, a green solar deck and a swimming machine with an unbelievable capacity of 1000 m³ (!) per hour.