Year of construction: 2022
water area:
- swimming area: 34 m²
- total area: 34 m²
water depth: 1,4 m
liner: light grey
other:
©John GmbH
planning and completion:
John GmbH
DE-96103 Hallstadt
Easier maintenance, a longer service life but still organic cleaning - these were the wishes of a Swimming Pond owner after several years of use. Now it has become a Biotop Living Pool. We lined the existing pool with a lighter-coloured liner, installed a heater and a roll-up cover, and made the outdoor area more open with turf. A Biotop natural pool adapted to life.