Fully accessible

fully-accessible-01

facts


Year of construction: 2016
water area:
- swimming area: 39 m²
- total area: 39 m²
water depth: 1,8 m
liner: light grey
other:

planning and completion:
Schleitzer baut Gärten creativ & innovativ GmbH
DE-80999 München

Fully accessible


The challenge with this project was to construct a handicapped-accessible, barrier-free pool, since the client is a wheelchair paraplegic. The existing swimming pool was removed and a new design taking the client’s handicap into consideration was created. The Living-Pool is architecturally straightforward, with clear lines and borders defining the ensemble. The water is heated by a heat exchanger inside the house, making the pool usable year-round. A pool-lift was integrated, and the pool cover retracts underneath a walkable surface of large granite slabs that can be removed if necessary. The combination with modern stainless steel elements like the shower, lift and handrail continue the straightforward style of the garden, and a lily pond was added as an additional design element.


fully-accessible-02
fully-accessible-03
fully-accessible-04

order catalogue



watch videos