Year of construction: 2018
water area:
- swimming area: 26000 m²
- regeneration area: 2600 m²
- total area: 26000 m²
water depth: 1,8 m
other:
30,000 kg Phostec Ultra
Upstream system was installed.
planning and completion:
Cem Botanik
tr-34805 Beykoz, Istanbul
The project consists of two biological pools. Three beaches and an additional wet sand area within the lake create a natural swimming experience that fascinates residents with its unique landscaping. The capacity is 3,000 swimmers per day.