Year of construction: 2003
water area:
- swimming area: 50 m²
- regeneration area: 50 m²
- total area: 100 m²
water depth: 2,0 m
liner: green
other:
planning and completion:
Biotop P&P International GmbH
AT-3400 Weidling
The pool was already built before the house was completed in 2003. As the pool was finished in April the owners were able to fully enjoy their pool during the construction phase. In August they moved into the passive solar house. The plain shape of the house is reflected in the geometrical pool that borders the terrace and is used intensively during the summertime.