Year of construction: 2013
water area:
- swimming area: 36 m²
- regeneration area: 36 m²
- total area: 72 m²
water depth: 2,2 m
other:
BIOTOP Phostec Ultra Filter and Underwater Lighting
planning and completion:
Poolscape Ltd.
GB-HR4 8LE Hereford
The BIOTOP rescue pool. This pool was a big step into the dark, with a very unhappy client, whose pool had turned dark green. First we calculated the transformation and enlargement of the regeneration zone. Once we had relined the pool, added a filter and installed BIOTOP equipment the pool that was raised from the ashes is the pool everyone sees today. Now it was clear to the client, the former customer from a competitive natural pool system, that the BIOTOP system is simply unbeatable. It was a lot of hard work but the pool has become a key reference for BIOTOP in the UK. Design Frog King 2015: 2nd Place – Category “Conversion and Renovation”