Year of construction: 2022
water area:
- swimming area: 29 m²
- regeneration area: 46 m²
- total area: 75 m²
water depth: 1,5 m
liner: green
other:
In this project, a swimming pond was created in which the swimming area was completely covered
with natural stone. Luserna gneiss was used, which contributes especially to the natural appearance.
Special details, such as the floor slabs laid in Roman
pattern or the wall slabs at the same height as the
respective wall without a transverse joint, dis
tinguish the facility. The water is wonderfully clear
and has a colour all of its own. The vegetation in
the regeneration zone has established itself in the
first year, although it is still somewhat sparse. The
customers enjoy their holiday home with the
Swimming Pond in the summer in Austria.
planning and completion:
Fresner Garten- und Landschaftsbau GmbH
AT-8962 Michaelerberg