Recovery spot with refreshment factor

recovery-spot-with-refreshment-factor-Dudelange-LU

facts


Year of construction: 2016
water area:
- swimming area: 28 m²
- regeneration area: 28 m²
- total area: 56 m²
water depth: 1,4 m
other:
TPS Standard, Expert 20000, Universal Eco 4000, Injector blue 2 x LED underwater spotlights

planning and completion:
my Garden s.à.r.l.
lu-5485 Wormeldange-Haut

Recovery spot with refreshment factor


The shell of this swimming pool was constructed entirely by the client’s Portuguese construction team. The shell was built before the actual renovation of the acquired old building in order to be able to use the access road to the rear part of the garden that was still available at that time. The result is a really sunny “recreation spot with refreshment factor” and a great view of the rest of the newly laid out garden with old trees.


recovery-spot-with-refreshment-factor-Dudelange-LU-2
recovery-spot-with-refreshment-factor-Dudelange-LU-detail
recovery-spot-with-refreshment-factor-Dudelange-LU-3

order catalogue



watch videos