Year of construction: 2021
water area:
- swimming area: 50 m²
- regeneration area: 50 m²
- total area: 100 m²
water depth: 1,5 m
liner: green
other:
110W Premium UVC Lamp Complete Set
planning and completion:
Garten- und Landschaftsbau Kreye GmbH & Co. KG
de-27777 Ganderkesee
An existing natural biotope was converted into a large Biotop Swimming Pond. A lot of emphasis was put on natural construction. In addition, only native or existing materials were used. Sunbleak fish multiply among native water plants, which the kingfisher enjoys for breakfast in the morning.