Renovation project in Steyr

renovation-steyr 1

facts


Year of construction: 2020
water area:
- swimming area: 35 m²
- regeneration area: 10 m²
- total area: 45 m²
water depth: 1,5 m
other:

planning and completion:
FREIRAUM Gartenarchitektur GmbH
at-4072 Alkoven

Renovation project in Steyr


The natural pool with gravel filter, which was built 15 years ago, was converted to a Living Pool after long discussions to and fro. The work required for the old natural pool was so high that conversion to a chlorine pool or complete deconstruction into a vegetable garden was seriously considered. But then an inspection of the finished installation was convincing. Client quote: "Now my pool is finally what I had always dreamed of."


renovation-steyr 2
renovation-steyr 3
renovation-steyr 4

order catalogue



watch videos