Year of construction: 2020
water area:
- swimming area: 35 m²
- regeneration area: 10 m²
- total area: 45 m²
water depth: 1,5 m
other:
planning and completion:
FREIRAUM Gartenarchitektur GmbH
at-4072 Alkoven
The natural pool with gravel filter, which was built 15 years ago, was converted to a Living Pool after long discussions to and fro. The work required for the old natural pool was so high that conversion to a chlorine pool or complete deconstruction into a vegetable garden was seriously considered. But then an inspection of the finished installation was convincing. Client quote: "Now my pool is finally what I had always dreamed of."