Year of construction: 2017
water area:
- regeneration area: 600 m²
- total area: 6000 m²
water depth: 2,0 m
other:
The Natural Pool was designed as an ornamental pond.
planning and completion:
Cem Botanik
tr-34805 Beykoz, Istanbul
The project was begun in March 2017 and completed in December 2017. Hiking trails were laid out around the lake to provide the residents with a natural hiking experience surrounded by the scent of lavender.