Year of construction: 2020
water area:
- swimming area: 60 m²
- regeneration area: 74 m²
- total area: 134 m²
water depth: 1,4 m
liner: dark grey
other:
The project consists of 2 parts. 1. living pool (technology see above) 2. fish pond with bio compact filter V50, 10 m² biofilter and pump skimmer.
planning and completion:
Hoveniersgebroeders bvba
BE-9890 Gavere
An old combined koi carp and swimming pond was separated into a Living Pool with a regeneration zone and a separate pond for the koi carp.The old combination was not a successful option, the algae problem also being very dominant, so we converted these ponds into two separate systems. The 5 x 12 metre Living Pool was covered with dark grey PVC liner and is attached to a regeneration zone and Biofilter behind it. In the swimming zone, a solar roll cover made of polycarbonate provides a cover but also protection for the children from the deeper part of the pool. If you compare the before and after, you can see an impressive difference.