Year of construction: 2019
water area:
- swimming area: 66 m²
- regeneration area: 30 m²
- total area: 96 m²
water depth: 1,5 m
liner: green
other:
source stone, 4 x halogeen radiators
planning and completion:
Garten- und Landschaftsbau Kreye GmbH & Co. KG
DE-27777 Ganderkesee
In this project, the client wanted to redesign the entire garden with a Swimming Pond. With difficult soil conditions, a natural Swimming Pond with many entry options was created here. A wooden footbridge, steps and a natural entrance ensure that none of the four children has to wait for other children when they want to swim. In addition, a heating system was installed to extend the bathing season for a short period of time. Furthermore, a sports field was created and a fully grown Acer Palmatum was integrated as a climbing tree. An outdoor shower has also found its place. A specially created garden house invites you to relax and eat together. Care was taken here to ensure that only natural materials were used.