Swimming Pond with pool character

swimming-pond-with-pool-character_Bremen,DE_1

facts


Year of construction: 2021
water area:
- swimming area: 40 m²
- regeneration area: 10 m²
- total area: 50 m²
water depth: 1,5 m
liner: blue
other:
110W Premium UVC Lamp Complete Set

planning and completion:
Garten- und Landschaftsbau Kreye GmbH & Co. KG
DE-27777 Ganderkesee

Swimming Pond with pool character


This Swimming Pond was originally intended to be a pool. The Swimming Pond that has now been created combines both in perfect form – clear lines with beautiful water plants. The circumstances were a great challenge here: the excavator had to be driven outside through a garden gate, and in addition there was a lot of water seepage from below at a depth of 80 centimetres. A wet pleasure before and after work.


swimming-pond-with-pool-character_Bremen,DE_2
swimming-pond-with-pool-character_Bremen,DE_3
swimming-pond-with-pool-character_Bremen,DE_4