Swimming training at the farm

swimming-training-at-the-farm

facts


Year of construction: 2018
water area:
- swimming area: 100 m²
- regeneration area: 90 m²
- total area: 190 m²
water depth: 1,8 m
liner: green
other:
additional Kombibox 50, automatic level control, 3 x Astel headlights

planning and completion:
Biotop Wassergestaltung T&P GmbH
AT-3411 Weidling

Swimming training at the farm


From the very first contact with the owner family, it became clear that something big was to be built on this newly acquired pumpkin field, which was right next to their own farm. The eldest daughter was in the swimming club, but suffered during her daily training from the chlorinated water. So the idea of a 25-metre-long Swimming Pond in masonry construction was born. During the planning phase, a feel-good aura developed for the whole family. With the Swimming Pond as the centrepiece, the garden was completely redesigned and laid out. The owner’s hobby dream, a small bar of his own, was realised in the spacious bathhouse in the form of a “Pond Taproom”. This created a meeting place, not only for the family but also for friends and neighbours.


swimming-training-at-the-farm-2
swimming-training-at-the-farm-3
swimming-training-at-the-farm-4

order catalogue



watch videos